{"id":379,"date":"2018-06-26T09:35:03","date_gmt":"2018-06-26T08:35:03","guid":{"rendered":"http:\/\/mon.uvic.cat\/life-demine\/?page_id=379"},"modified":"2018-06-26T09:35:03","modified_gmt":"2018-06-26T08:35:03","slug":"expected-results","status":"publish","type":"page","link":"https:\/\/mon.uvic.cat\/life-demine\/project-results\/expected-results\/","title":{"rendered":"Expected results"},"content":{"rendered":"<div class=\"su-column su-column-size-1-2\">\n<div class=\"su-column-inner su-clearfix\">\n<p>The <strong>main<\/strong> expected result is to\u00a0produce a significantly improved mine effluent to be discharged in water bodies with minimal environmental impact, being in line with the Water Framework Directive and the EU Biodiversity Strategy objectives.<\/p>\n<p>The\u00a0<strong>specific<\/strong> results expected to be obtained at the end of the project are:<\/p>\n<p>\u2013 Composition of several abandoned mine wastewaters in different European regions.<\/p>\n<p>\u2013 Characterization of the ecological impact of abandoned mine wastewaters on aquatic ecosystems.<\/p>\n<p>\u2013 Optimal operational conditions of the METP* determined at bench scale to properly design the pilot scale treatment plant.<\/p>\n<p>\u2013 Versatile METP plant to treat mining wastewaters coming from different mining activities.<\/p>\n<p>\u2013 Have treated around 10000 m<sup>3\u00a0<\/sup>of abandoned mines wastewater (5000 m<sup>3<\/sup>\u00a0in each site).<\/p>\n<p>\u2013 Obtaining a final effluent that could be discharged to the water bodies without any risk and being in line with the current legislation framework.<\/p>\n<p>\u2013 Remove &gt;95% of total metals and salts content.<\/p>\n<p>\u2013 Significantly increase the biodiversity of water bodies.<\/p>\n<p>\u2013 Decrease the environmental impact that current abandoned mine wastewaters are causing across the whole European territory.<\/p>\n<p>\u2013 Transfer knowledge acquired in the project to key stakeholders and policy makers.<\/p>\n<p>\u2013 It is expected to change the behaviour of several key stakeholders regarding mining effluent treatment (regulators, mining companies).<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #808080\"><em>*Mining Effluent Treatment Process<\/em><\/span><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The main expected result is to\u00a0produce a significantly improved mine  [&#8230;]<\/p>\n","protected":false},"author":233,"featured_media":0,"parent":27,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-379","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/379","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/users\/233"}],"replies":[{"embeddable":true,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/comments?post=379"}],"version-history":[{"count":9,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/379\/revisions"}],"predecessor-version":[{"id":433,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/379\/revisions\/433"}],"up":[{"embeddable":true,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/27"}],"wp:attachment":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/media?parent=379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}