{"id":370,"date":"2018-06-26T09:35:05","date_gmt":"2018-06-26T08:35:05","guid":{"rendered":"http:\/\/mon.uvic.cat\/life-demine\/?page_id=370"},"modified":"2022-09-30T15:52:03","modified_gmt":"2022-09-30T14:52:03","slug":"obtained-results","status":"publish","type":"page","link":"https:\/\/mon.uvic.cat\/life-demine\/project-results\/obtained-results\/","title":{"rendered":"Obtained results"},"content":{"rendered":"<h2><span style=\"color: #993300\"><strong>A. PREPARATORY ACTIONS<\/strong><\/span><\/h2>\n<p>&nbsp;<\/p>\n<p><strong>A1.<\/strong> Policy and legislation assessment.<\/p>\n<p><span style=\"color: #808080\">An extensive review of the different waste management policies and directives at European, Spanish, British and German level had been performed in order to cover the whole range of legislation that could affect the environmental problem targeted in the DEMINE project. In that sense, policies related to the protection of water bodies and mining directives had been assessed as the main legal framework affecting the environmental problem targeted.<\/span><\/p>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #00ff00\"> <span style=\"color: #993300\"><span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #808080\">Links of interest:<\/span><\/p>\n<ul>\n<li><span style=\"color: #808080\"><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2018\/07\/D_A.1_Summary_Policy-and-Legislation-Assessment.pdf\">D_A.1_Summary_Policy and Legislation Assessment<\/a><\/span><\/li>\n<\/ul>\n<p><strong>A2.<\/strong> Assessment of the European mining sector. Characterisation of several mining effluents.<\/p>\n<p><span style=\"color: #808080\">An extensive database containing the composition of several mining effluents across Europe has been developed. In particular, the database already contains 5618 data sets from 90 different European mining sites, but it will be extended during the whole project execution. At the same time, a European map showing the location of the mining sites contained in the database has been created to better locate the regions affected by these polluting effluents.<\/span><\/p>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #808080\">Links of interest:<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2018\/07\/D_A.2_Summary_Database-of-mining-effluents.pdf\">D_A.2_Summary_Database of mining effluents<\/a><\/li>\n<\/ul>\n<hr \/>\n<h2><span style=\"color: #993300\"><strong>B. IMPLEMENTATION ACTIONS<\/strong><\/span><\/h2>\n<p>&nbsp;<\/p>\n<p><strong>B1.<\/strong>\u00a0Process design and selection of the operating parameters.<\/p>\n<p><span style=\"color: #808080\">The treatment process proposed will be based upon membranes and electrocoagulation (EC). Both of these technologies are well-known and are established separately for various applications, but it will be the first time that they will be tested together to treat mining wastewaters. Therefore, it is essential to define the optimal operational parameters that are required to specifically treat the mine wastewaters from the selected sites before completing the plant engineering in order to assure robust performance of the new process.<\/span><\/p>\n<p><span style=\"color: #808080\">Using bench scale equipment, SWANSEA will test and optimize the different steps involved in the innovative treatment process to define the best operation conditions and to make a first evaluation of the process performance for the three mining wastewaters coming from the two project sites.<\/span><\/p>\n<p><span style=\"color: #808080\">Links of interest:<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2019\/05\/D_B.1_Summary_Minewaters-characterisation.pdf\">D_B.1_Summary_Minewaters characterisation<\/a><\/li>\n<\/ul>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\">\u00a0<span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<p><strong>B2.<\/strong>\u00a0Design and construction of the innovative mining effluent treatment process.<\/p>\n<p><span style=\"color: #808080\">The main objective of this action is to construct a Mining Effluent Treatment Process (METP) in order to be tested and then deployed to the two trial sites in the project. ELENTEC, with the support of SWANSEA, will design and construct the prototype.<\/span><\/p>\n<p><span style=\"color: #808080\">Links of interest:<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2019\/07\/D_B2.1_PID-of-the-METP-public-summary.pdf\">D_B2.1_PID-of-the-METP-public-summary<\/a><\/li>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2019\/07\/D_B2.2_Design-and-specification-of-the-METP-public-summary.pdf\">D_B2.2_Design-and-specification-of-the-METP-public-summary<\/a><\/li>\n<\/ul>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<p><strong>B3.<\/strong>\u00a0Implementation and operation of the innovative treatment ptocess in Welsh abandoned mines.<\/p>\n<p><span style=\"color: #808080\">The main objective of this action is to demonstrate METP plant at the first deployment site in Wales, UK. The innovative treatment process will be tested in Welsh abandoned mines. The quality of the final water obtained, as well as the quality of the recovered products will be evaluated.<\/span><\/p>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<p><strong>B4.<\/strong>\u00a0Implementation and operation of the innovative treatment ptocess in German mines.<\/p>\n<p><span style=\"color: #808080\">The main objective of this action is to demonstrate the METP plant at the second deployment site in Germany, EU. The innovative treatment process will be tested in German abandoned mines. The quality of the final water obtained, as well as the quality of the recovered products will be evaluated.<\/span><\/p>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<p><strong>B5.<\/strong>\u00a0Replication and transferability of the obtained results.<\/p>\n<p><span style=\"color: #808080\">This action aims to establish the guidelines to properly transfer and exploit the LIFE DEMINE result.<\/span><\/p>\n<p><span style=\"color: #808080\">Links of interest:<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2019\/09\/D_B.5.4_Business-Plan-Initial-Version.pdf\">D_B.5.4_Business Plan-Initial Version<\/a><\/li>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2022\/09\/D_B.5.2.2_End-User-Experience-4.pdf\">D_B.5.2.2_End-User Experience<\/a><\/li>\n<\/ul>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<hr \/>\n<h2><span style=\"color: #993300\"><strong>C. MONITORING OF THE IMPACT OF THE PROJECT ACTIONS<\/strong><\/span><\/h2>\n<p>&nbsp;<\/p>\n<p><strong>C1.<\/strong> Monitoring the project&#8217;s sustainability. Design and construction of the innovative mining effluent treatment process.<\/p>\n<p><span style=\"color: #808080\">The first monitoring task will be devoted to analyze the performance of the currently available techniques to treat mining effluents from an environmental and economic point of view, with the goal to determine \u201cbest in class\u201d and \u201cworst in class\u201d treatments. This task aims to set up a benchmark to compare the DEMINE technology with the available options.<\/span><\/p>\n<p><span style=\"color: #808080\">The environmental impact of the project will be assessed by means of the Life Cycle Assessment (LCA). LCA will be performed using the methodology and criteria established by the ISO 14040 and 14044. The calculation methodology proposed is ReCiPe (H) at both midpoint and endpoint levels, hence including impact oriented and damage oriented categories. Fig C.10 shows the system boundaries of the environmental analysis.<\/span><\/p>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #808080\">Links of interest:<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2018\/07\/D_C.1.1_Summary_Envrionmental-and-economic-impact-analyses.pdf\">D_C.1.1_Summary_Envrionmental and economic impact analyses<\/a><\/li>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2022\/09\/D_C1.3.2_Metodology-guide-for-environmental-social-and-economic-impact-mitigation_Vf.pdf\">D_C1.3.2_Metodology guide for environmental, social and economic impact mitigation<\/a><\/li>\n<\/ul>\n<p><strong>C2.<\/strong>\u00a0Monitoring and measuring og the LIFE project performance indicators.<\/p>\n<p><span style=\"color: #808080\">The Action C.2 aims to monitor and measure the identified LIFE project performance indicators in order to quantify\u00a0<\/span><span style=\"color: #808080\">the project impact on the environmental problem targeted. This action will be devoted to compile the\u00a0<\/span><span style=\"color: #808080\">information needed to update and quantify the performance indicators suggested and enclosed in this\u00a0<\/span><span style=\"color: #808080\">proposal.<\/span><\/p>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<hr \/>\n<h2><span style=\"color: #993300\"><strong>D. PUBLIC AWARENESS AND DISSEMINATION OF RESULTS<\/strong><\/span><\/h2>\n<p>&nbsp;<\/p>\n<p><strong>D1.<\/strong>\u00a0Dissemination planning and development of the dissemination pack.<\/p>\n<p><span style=\"color: #808080\">This action aims to disseminate:<\/span><\/p>\n<p><span style=\"color: #808080\">-The environmental problem caused by abandoned mine effluents in water bodies<\/span><\/p>\n<p><span style=\"color: #808080\">-The main objectives and results of the DEMINE project.<\/span><\/p>\n<p><span style=\"color: #808080\">This will be done by creation of a communication strategy and dissemination plan, project website, information boards, Layman\u2019s report, scientific publications, brochures, project promotional video and broadcast in the local media.<\/span><\/p>\n<p><span style=\"color: #808080\">Links of interest:<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2018\/07\/D_D.1.1_Summary_Communication-strategy-and-dissemination-plan.pdf\">D_D.1.1_Summary_Communication strategy and dissemination plan<\/a><\/li>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2019\/07\/D_D.1_Brochures_Life-Demine.pdf\">D_D.1_Brochures_Life Demine<\/a><\/li>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2019\/07\/D_D.1_LIFE-DEMINE_Information-board.pdf\">D_D.1_LIFE DEMINE_Information board \/ <\/a><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2020\/01\/Roll-up-Life-Demine-PRAS.pdf\">Roll-up Life Demine PRAS<\/a><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2019\/07\/D_D.1_LIFE-DEMINE_Information-board.pdf\"> \/ <\/a><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2020\/01\/Roll-up-Life-Demine-Elentec.pdf\">Roll-up Life Demine Elentec \/ <\/a><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2020\/01\/Roll-up-Life-Demine-DGRC.pdf\">Roll-up Life Demine DGRC<\/a><\/li>\n<li><a href=\"https:\/\/youtu.be\/FGhsBMkYrw4\">D_D.1_LIFE DEMINE_promotional video<\/a><\/li>\n<li><span style=\"color: #808080\"><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2022\/09\/D_D1._Report-DEMINE-tool.pdf\">D_D1._Report DEMINE tool<\/a><\/span><\/li>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2022\/09\/D_D.1.5_Laymans_compressed.pdf\">D_D.1.5_Laymans<\/a><\/li>\n<\/ul>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<p><strong>D2.<\/strong>\u00a0Open days and networking.<\/p>\n<p><span style=\"color: #808080\">The LIFE DEMINE project management will be harnessed by an expert team with several years of experience<br \/>\nin management of national and international projects.<\/span><\/p>\n<p><span style=\"color: #808080\">This will be done by performing networking activities with other projects, attending to international conferences, participating in social media and organizing open days.<\/span><\/p>\n<p><span style=\"color: #808080\">Links of interest:\u00a0<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2022\/09\/D_D.2.1_Report_Summary-of-the-open-days-performed_FINAL-2.pdf\">D_D.2.1_Report_Summary of the open days performed_FINAL<\/a><\/li>\n<li><span style=\"color: #808080\"><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2022\/09\/D_D.2.2_Report_Summary-of-the-networking-activities_FINAL-2.pdf\">D_D.2.2_Report_Summary of the networking activities_FINAL<\/a><\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #808080\">STATE:<\/span><span style=\"color: #993300\"> <span style=\"color: #99cc00\">COMPLETED<\/span><\/span><\/strong><\/p>\n<hr \/>\n<h2><strong><span style=\"color: #993300\">E. PROJECT MANAGEMENT<\/span><br \/>\n<\/strong><\/h2>\n<p><strong>E1.<\/strong> Project management.<\/p>\n<p><span style=\"color: #808080\">The LIFE DEMINE project management will be harnessed by an expert team with several years of experience in management of national and international projects.<\/span><\/p>\n<p><span style=\"color: #808080\">The After Life+ communication plan will give short detail about the project indicating the innovation and demonstration aspects of the project. The plan will then, detail the Environmental, Social and Economic benefits of the project and showing how the project is relevant to European legislation.<\/span><\/p>\n<p><span style=\"color: #808080\">Links of interest:\u00a0<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/mon.uvic.cat\/life-demine\/files\/2022\/09\/D_E.1.3_After-LIFE-Communication-Plan.pdf\"><span style=\"color: #000000\">D_E.1.3_After-LIFE Communication Plan<\/span><\/a><\/li>\n<\/ul>\n<p><strong>STATE: <span style=\"color: #99cc00\">COMPLETED<\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A. PREPARATORY ACTIONS &nbsp; A1. Policy and legislation assessment. An  [&#8230;]<\/p>\n","protected":false},"author":233,"featured_media":0,"parent":27,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-370","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/users\/233"}],"replies":[{"embeddable":true,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/comments?post=370"}],"version-history":[{"count":46,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/370\/revisions"}],"predecessor-version":[{"id":906,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/370\/revisions\/906"}],"up":[{"embeddable":true,"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/pages\/27"}],"wp:attachment":[{"href":"https:\/\/mon.uvic.cat\/life-demine\/wp-json\/wp\/v2\/media?parent=370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}